Extension of the University Campus – Bovisa of the Polytechnic of Milan
Executive design of the structures (2006)
Customer: S.E.S.T.O. S.C.a.r.l.
This work is composed of four buildings MIP-DIG separated by structural joints, but part of the same building complex with different heights between two and six floors, realized with frame structure in reinforced concrete and with metal.
Structural work amounts: ~ 3.000.000,00€
The construction of the buildings has been concluded.

